Before initially filling your heating system with thermal fluid try to estimate how much to have on hand for startup. Thereafter, you should know exactly how much is required. The Figures shown below can help you estimate the amount needed for typical plants. If your plant components differ from the ones listed, add or subtract accordingly.
|
Stationary Plant
Thermal Fluid Capacity (Gallons)
|
|
Heatec HC-200 heater
|
159
|
|
Two 30,000 gallon horizontal coil tanks for virgin asphalt
|
462
|
|
One 25,000 gallon vertical asphalt tank for PMAC
|
45
|
|
Heavy fuel preheater
|
30
|
|
Double Barrel drum mixer, 9 ft x 46 ft
|
10
|
|
Drag conveyor, 42 inch x 100 ft
|
132
|
|
Three 300-ton storage silos
|
210
|
|
Traverse conveyor, 36 inch x 33 ft
|
44
|
|
100 feet of asphalt piping, 4-inch dia
|
77
|
|
230 feet of hot oil piping, 1-1/2 inch dia
|
24
|
|
Plant Total
|
1193
|
|
Portable Plant
Thermal Fluid Capacity (Gallons)
|
|
Heatec HCS-100 heater
|
96
|
|
One 30,000 gallon Heli-tank for asphalt
|
231
|
|
Double Barrel drum mixer 7 ft x 35 ft
|
10
|
|
Drag conveyor on surge bin, 24 inch x 50 ft
|
66
|
|
70 feet of asphalt piping, 4-inch dia
|
54
|
|
150 feet of hot oil piping, 2-inch dia
|
26
|
|
Plant Total
|
483
|
|
Relocatable Plant
Thermal Fluid Capacity (Gallons)
|
|
Heatec HC-120 heater
|
96
|
|
Two 30,000 gallon horizontal coil tanks for asphalt
|
462
|
|
Double Barrel drum mixer, 8ft x 39 ft
|
10
|
|
Drag conveyor, 36 Inch x 95 ft
|
125
|
|
Two 200-ton storage silos
|
44
|
|
Traverse conveyor, 36 Inch x 14 ft
|
18
|
|
100 feet of asphalt piping, 4-inch dia
|
77
|
|
230 feet of hot oil piping, 1-1/2 inch dia
|
24
|
|
Plant Total
|
857
|
|
Heater
Thermal Fluid Capacity (gallons)
|
|
Model
|
Coil
|
Expansion Tank*
|
Total
|
|
HCS-70
|
35
|
25
|
60
|
|
HCS-100
|
52
|
44
|
96
|
|
HCS-175
|
89
|
70
|
159
|
|
HCS-250
|
150
|
70
|
220
|
|
HC-120
|
52
|
44
|
96
|
|
HC-200
|
89
|
70
|
159
|
|
HC-300
|
150
|
70
|
220
|
|
*Expansion tank 1/4 full.
|
|